Home projects on the Skyway hillside
Streets across Skyway run steeply off the ridge and most lots have one usable flat area at the front. A Skyway remodel puts the unit on the parking apron beside the dumpster, which is nearly always the only option. We agree on the Skyway position on the first delivery and keep it there rather than shuffling it each week.
Additions and deck rebuilds in Skyway run two to four months, and weekly service covers them comfortably. Where a Skyway site has several trades working together we add a second pass for those weeks.
Community ground, parks and events in Skyway
The park and the community center give Skyway its public gathering space and both see regular renewal work. A Skyway community day takes two or three standard units plus an ADA accessible unit on the parking lot asphalt. Handwashing stations go beside the food tables at a Skyway event without anyone needing to ask.
We deliver into Skyway on the Friday and collect on the Monday, because nothing on the route runs on a Sunday.
Street work, storms and ground in Skyway
The arterials through Skyway are dug up for water and sewer work most summers. A Skyway trenching crew takes a unit inside the coned area and shifts it forward with the dig. Tree crews work the Skyway side streets every winter clearing limbs off drives and parked cars. Those Skyway crews usually keep a unit for two weeks while the debris is chipped.
Skyway sits on till over hardpan, so surface water runs down the hill rather than soaking away and every long rental gets a base. Hard freezes are rare in Skyway, but they make the steeper side streets unsafe for a loaded truck.
