Remodels on the Parkwood streets
The houses through Parkwood date from the 1950s and 1960s and most are on their second round of work. A Parkwood remodel keeps one unit on the driveway apron beside the dumpster for a month or three. Side yards in Parkwood are narrow and fenced, so the apron is nearly always the only dependable position.
Kitchen, bath and basement projects in Parkwood run longer than owners expect once permits are counted. Weekly service suits a Parkwood job, with an extra pass when several trades are on at the same time.
School grounds and small parks in Parkwood
Summer field, roof and paving work on the Parkwood school grounds follows the school calendar exactly. A Parkwood grounds contract takes fenced units on the service drive away from any student walking route. We service Parkwood school sites at first light so the contractor's day starts without a truck in the way.
Playground and path renewals at the Parkwood parks take a unit on the parking lot asphalt beside the contractor vehicles. Drainage and habitat work at the Parkwood bog margins keeps the unit on the gravel access, outside the flagged buffer, for the whole contract.
Community events and ground conditions in Parkwood
Neighborhood events in Parkwood are modest, and two units with a handwashing station cover most of them. A Parkwood block party or school fundraiser is a Friday delivery with a Monday collection, since there is no Sunday work. Tree crews come through Parkwood every winter clearing limbs off the streets and drives.
Parkwood ground is till over hardpan with a high winter table, so gravel or plywood goes under every long rental. Those Parkwood cleanup crews usually keep a unit for two weeks while the debris is carted away.
