Waterfront and beach park work at Mukilteo
The waterfront at Mukilteo packs a ferry terminal, a lighthouse park and a boat launch into a short stretch. Summer events at Mukilteo take standard units on the parking lot asphalt plus an ADA accessible unit on the level route. We deliver into Mukilteo early, because the waterfront lots fill from mid-morning through the whole afternoon.
Pier, ramp and seawall repairs at Mukilteo run in the shoulder seasons and stage from the hardstand behind the promenade. Those Mukilteo crews take one unit on paving rather than anywhere near the beach.
Gulch trails and bluff contracts at Mukilteo
The wooded gulch behind Mukilteo carries trails, a creek and a steady run of drainage and tread work. Crews on a Mukilteo gulch contract take one unit at the street-end access and carry their tools down. Creek buffers through the Mukilteo gulch are flagged and the unit stays outside them at all times.
Slope and retaining work on the Mukilteo bluff keeps the unit at street level on gravel for the whole job. Storm cleanup across the Mukilteo streets runs through winter, and those crews usually keep a unit for two or three weeks while debris is chipped.
Streets, schools and home projects in Mukilteo
Above the shore, Mukilteo is streets of houses taking additions, new decks and second roofs. A Mukilteo remodel keeps one driveway unit for a month or two on weekly service. School grounds work at Mukilteo is summer work with fenced units on the service drive away from walking routes.
Ground at Mukilteo is till with a high winter table, so gravel or plywood goes under every long rental. Hard freezes are rare at Mukilteo, but they make the steeper bluff drives unsafe for a loaded truck.
