Parks and beach maintenance in Medina
Medina Beach Park, Fairweather and Viewpoint Park together give the city a steady program of grounds work. Parks contractors in Medina want the unit on asphalt at the edge of the parking lot, not on the lawn the crew is there to repair. We set the Medina unit where the service truck can pull alongside without backing up across a public path.
Summer swim programs and the beach lifeguard season stretch the permanent facilities in Medina. Two standard units and an ADA accessible unit at the Medina park edge cover the busiest weekends without anyone crossing turf.
Shoreline repair along the Medina waterfront
The Medina shoreline runs from Evergreen Point round to Groat Point, and almost all of it is private dock frontage. Bulkhead and dock crews in Medina work the winter in-water window and stage from the driveway, since the banks are steep and planted. A Medina unit on that kind of job sits on gravel at the top of the drive and is serviced before the barge arrives. Piling rigs and float crews on the Medina waterfront turn up early, and a pump truck parked in their way costs everybody an hour.
Long builds and neighborhood rhythm in Medina
A rebuild in Medina is rarely a short job, and the same unit often stays from demolition through the final planting. Medina streets are quiet and closely watched, so everything of ours stays inside the site fence. We service Medina early in the morning and keep the truck off Evergreen Point Road during the school run.
Winter ground in Medina is till over hardpan with a high table, and any unit left on bare soil will be out of level by February.
