Outbuildings and fencing on Fobes Hill
Parcels on Fobes Hill are large enough that the barn is rarely anywhere near the house. Shop builds, run-in sheds and fence lines on Fobes Hill put the unit beside the work rather than at the front door. We drive a Fobes Hill track once before committing, because gravel that carries a pickup will not always carry a loaded truck.
Septic and well replacements on Fobes Hill add a handwashing station, because the house supply is off for the duration.
Hillside house projects on Fobes Hill
Building on the Fobes Hill slope means drainage, retaining and a long permit process before framing starts. A Fobes Hill house project keeps one unit for six months or more on weekly service. The only level ground on a Fobes Hill lot is usually the parking apron, so that is where the unit sits.
Runoff down a Fobes Hill drive undercuts anything on bare soil, which is why gravel goes underneath as standard. Retaining wall crews work the lower half of a Fobes Hill lot for months before the house begins, and the unit stays at the top of the drive throughout.
Storms, pasture and winter ground on Fobes Hill
Firs come down across the Fobes Hill drives in any serious blow and cleanup crews call within a day. We set the Fobes Hill unit on the nearest firm shoulder while the drive is still blocked by timber. Pasture and fencing work on Fobes Hill runs in the dry months, with the unit at the field gate on gravel.
Ground on Fobes Hill holds water from November through April, so every long rental gets a base put down.
