Roadwork and utility trenching in Eastgate
Eastgate carries a lot of traffic for a neighborhood, and the arterials here are dug up most summers. A paving or watermain crew in Eastgate takes a unit inside the cone taper and moves it forward as the trench advances. We service Eastgate roadwork early, because once the lane closure tightens there is nowhere for a pump truck to stand.
Night work happens on the Eastgate connectors, and those crews want the unit set before the shift rather than during it. Give us the Eastgate closure plan and the unit goes in at the right end of the job.
Campus and institutional grounds work in Eastgate
Bellevue College sits at the top of Eastgate and its grounds, parking lots and playing fields are under contract work most summers. An Eastgate campus job takes a fenced unit on a service road away from student routes, which is also where the service truck can reach it. Church and school sites across Eastgate follow the same pattern, with the unit screened on the staff parking lot. Graduation week and summer camps put extra pressure on the permanent facilities at Eastgate, and a pair of standard units takes the edge off that for two weeks.
Hillside subdivisions and park contracts in Eastgate
The 1960s subdivisions on the Eastgate hillside are at the age where whole streets are being reroofed and re-decked. An Eastgate driveway holds the unit next to the dumpster, because the side yards here are steep and narrow. Park and trail contracts around the Eastgate greenbelts stage from gravel pull-outs rather than going in on the path.
Eastgate soils are till over hardpan and the winter runoff off the hill is considerable, so we pad every long-rental base.
