Town events and main street work in Duvall
Duvall runs a summer of street fairs, markets and parades along a main street that closes for each one. A Duvall street event takes standard units on the asphalt at the closure ends plus an ADA accessible unit on the level route. We deliver into Duvall the evening before, because once the barriers go up nothing larger than a handcart moves.
Handwashing stations go beside every Duvall food vendor without being asked. A weekend Duvall booking is serviced Saturday morning and collected on Monday, since there is no Sunday operation.
Valley trail, river and park contracts in Duvall
The Snoqualmie Valley Trail runs the length of Duvall on the old rail grade and needs regular surfacing and bridge work. Crews on a Duvall trail contract take one unit at the nearest road access and move along with the work front. River bank and levee projects at Duvall keep the unit up on the dyke road outside the flagged buffer.
Bridge deck and railing work on the Duvall approaches runs in short closures through late summer. Those Duvall crews take one unit at the closure end, and we service it before the morning traffic builds on the valley highway.
Farms, hillsides and home projects around Duvall
The flats west of Duvall are hay and pasture, and the hillsides east of it are five-acre parcels with barns. A Duvall farm or acreage job takes a unit at the field gate on gravel plus handwashing where the crew is working produce. Home remodels in Duvall keep a driveway unit for a month or two on weekly service.
Valley alluvium at Duvall stays wet into late spring, and we pull units off low ground when the river forecast turns.
