Bays, docks and boat launches in Bellevue
The Bellevue shoreline is short but busy, running from Meydenbauer Bay south past Enatai to the Newport Shores canals. Dock, piling and bulkhead crews in Bellevue work the winter in-water window and stage from the street, because the banks drop away too fast for anything else. We set a Bellevue shoreline unit on the drive apron or the road shoulder where the pump hose reaches without crossing a planting bed.
Boat launch and marina maintenance around Meydenbauer Bay is the other half of the Bellevue waterfront calendar. A Bellevue launch closure gets a single unit on the hardstand beside the ramp, serviced before the morning crews arrive.
Parks, greenbelts and trail contracts across Bellevue
Mercer Slough, the Lake Hills Greenbelt and the Coal Creek trails give Bellevue parks contractors work in every month of the year. Boardwalk repairs in the Bellevue wetlands cannot take a unit past the trailhead, so it stays in the gravel parking lot with the trucks. Blueberry farm and nursery work in the Bellevue slough is seasonal and usually wants one unit for a few weeks at a time.
Summer festivals and park concerts in Bellevue need banks on asphalt rather than turf, with an ADA accessible unit on the level route in.
Remodels and additions in the older Bellevue neighborhoods
West Bellevue, Woodridge and the Lake Hills streets are full of 1950s houses being opened up or built over. A Bellevue remodel keeps one unit on the driveway apron beside the dumpster for most of a year. Bellevue soil is glacial till over hardpan and the winter water table sits high, so anything left on turf will lean by spring.
We service most Bellevue residential jobs weekly and add a second pass when the trades stack up at drywall and paint.
